
Pre-fab C-cans for 'plug&play'


Door R-R

Pre-fab C-cans for 'plug&play'
Hunting Rd
Abbotsford
BC, Canada
Managed a team of consultants in BC and California for the design of a Cannabis Production Facility, incorporating a fully integrated system with “pods” of self-contained units to maximize harvest times. The overall facility will consist of a 48,000 sqft warehouse and a 3,800 sqft extraction plant.
Design Details
-
Security and traceability
-
Employee training and compliance standards
-
Efficient removal/ recycling of water
-
Electrical/ Mechanical
-
Transportation and logistics for retail, packaging, and processing
-
Testing capabilities and protocols
-
An accurate description of grow facility, operations planning, and production process (including equipment, soil, and fertilizers to be used)
Team List
Surveyor- South Fraser Land Survey
Prefabricated Steel Structure- Byrtex.com
Structural Engineering- neale-engineering.com
Geotechnical Engineer- ablegeo.com
Mechanical & Electrical- AJ Pumphouse